Home | Today's Church | History | Church Life | Buildings | The Town | Pictures
Interior | Exterior | People | Groups | Other Images

4 February 2005
The structure to level the floor is well underway. At the front of the church near the pillars, the floor level was raised by nearly 2 feet.

Previous Picture Next Picture

Interior Renovations - Spring 2005